Medina County Sanitary Engineers
Liverpool Wastewater Treatment Plant

Sewerage

This Division maintains approximately 532 miles of sanitary sewers throughout the County which includes the City of Medina, the City of Brunswick and several townships. There are three (3) Waste Water Treatment Plants which have a total average rated daily capacity of 19.5 million gallon per day while they are presently treating approximately 12.5 million gallon per day and serving approximately 33,755 homes and businesses. Since these treatment plants are located within the Lake Erie Drainage Basin extremely high water quality parameters are required, which are consistently met by these facilities. The Liverpool Waste Water Treatment Plant accepts septage from registered septic tank haulers located within the County.

© 2006 Medina County Sanitary Engineers
Valid XHTML 1.1 Valid CSS 2